Product in the age of AI, part 3: decisions with defaults

AI agents work all night and don't wait well. The product lead becomes the bottleneck, so every open question needs a default and your review time needs a budget.

Dan Fernández

· 3 min read

Part 3 of Product in the age of AI.

With a human team, a question for the product lead can wait a day or two. People work on something else in the meantime and nobody notices much. With AI agents, a question that waits stops the work. They run around the clock, a dozen at a time, and each one that hits “I need a product decision” sits idle until it gets one. Building Lanyard, I found out fast that the bottleneck was me.

49 decisions in one day

A few days into the project there was a list of open product decisions: pricing details, what the sample event could do, how long recordings could run, what happens when the on-device model isn’t available, what telemetry to collect. I worked through 49 of them in one day, which was only possible because each came written up the same way:

  • the question, in one sentence;
  • the options, usually two or three;
  • the default: what happens if I don’t answer, and why.

Most of my answers were “the default is fine”. Several were “the default is fine, but change this one thing”, and a few needed real thought. The format meant my time went on those few.

Out of that came a rule: no open question without a default. An agent that needs a product decision writes it up, picks the default, carries on with it and marks the work “waiting for founder review”. Nothing stops, because the default gets built. If I agree, nothing changes, and if I don’t, the change is usually small, since building it was cheap. I’m no longer answering questions with obvious answers, and my attention goes to the ones where the default was a guess.

It also changes how you get ready to be away. I’m about to be away for several weeks in the run-up to launch, so before I go, every decision the agents might need gets a written default, and the work doesn’t wait on someone who isn’t there.

Review time is a budget

Some things I won’t hand over: the encryption code, the Keychain, anything that touches the network, anything that sends a user’s data, the consent screens and the payment flow. I review those line by line, and agents can produce that code far faster than I can review it.

So I started tracking review time like any other budget: what’s open, roughly how long each review will take, and what’s blocked on it. Right now the list before I leave adds up to almost six hours, with more than seven hours already planned for when I get back. That number tells me where to spend effort. I ask for changes that touch one sensitive thing at a time, so each review is smaller. Every sensitive change comes with what it does, what it doesn’t do and the tests that prove it, so each review is easier. And I review less, deliberately: only the parts where a mistake hurts users get line-by-line review, and everything else gets tests and spot checks. If the queue keeps growing anyway, either the reviews are too big or I’m reviewing things I shouldn’t.

Who decides what

Defaults only work because the boundaries are clear. Agents can decide anything inside the spec and the product rules, and propose anything outside it. They can’t add a third-party dependency, because the allowed ones are listed in a file only I can change. They can’t change the privacy rules or merge their own work; one coordinating session merges, and only after the tests pass. And they can’t publish or send anything outside the app.

Twice an agent needed a new library. Both times it wrote down why, took the default, which was to wait, and stopped. It didn’t add the line itself. That’s what I’d want from a person too: clear authority, a default for everything else, and a short list of things that always come back to me.

If your team is adopting agents, you’ll feel this within weeks, as the agents speed up and you don’t. Setting it up well, from who decides what to the defaults and the review budget, is a large part of what I do when I work embedded with a team. If the team stops when you’re away, you’re the bottleneck.

Next: evals are the new acceptance criteria.

Working on something similar?

If this is close to a problem your team has, tell us about it.